New season work update

  • 28 May 2023
  • Richard Borrell

Slowly progressing with improvement work on the river. The heavy rains and high water have managed to set us back this year. So far we have rebuilt peg 6 at cuddesdon, new platforms at peg 10 and 11 at cuddeddon. We have improved the peg 9 swim at cuddesdon by removing a tree from the river so should be good for pole, stick float or ledger. Widened the bridge at the upstream end of chiselhampton and built a new platform at peg 2 chiselhampton giving a better view of the swim.

Share this post